Buyer24.ai

How to Compare Quotes from Two Foundries

Quote ComparisonBy Erik Anderson
Updated September 3, 2026

Two foundry quotes on the same part are rarely comparable as received. Before looking at the piece price, normalize five lines: how tooling is treated, what machining is included, whether the alloy was substituted, what finishing covers, and which Incoterm applies. The apparent spread usually narrows sharply once those are aligned.

The Normalizer

LineWhat differsHow to align it
ToolingAmortized into piece price or invoiced separatelyRestate both as tooling plus piece price at your annual usage
MachiningAll features, listed features, or as-castPrice the missing operations before comparing
AlloyAs specified or an equivalent the shop meltsConfirm any substitution and its properties in writing
FinishingIncluded or quoted as a secondary operationMove it into the same column for both
Freight and dutyEXW, FCA or DDPCompare landed cost, never piece price
MOQ and price breaksDifferent break pointsEvaluate at your actual order quantity
ValidityDays or a quarter, different metal basisNote expiry; an expired cheaper quote is not cheaper
Lead timeTooling, first article and production quoted together or apartBuild one calendar per supplier

Why the Quotes Arrive Incomparable

It is rarely evasion. Supplier-side quoting is still overwhelmingly manual, so each estimator answers in their own format with their own assumptions about what was implied. The gaps in your request become the differences in their responses.

After Normalizing, Score More Than Price

Once the commercial lines are aligned, bring in capacity at your volume, past on-time performance, certification status and lead-time reliability. A shop that is three percent cheaper and two weeks less reliable is not cheaper.

How Buyer24 Helps

Buyer24 extracts line items from quotes in whatever format they arrive and puts them into a single like-for-like view, so tooling treatment and scope differences are visible before you compare prices. Get started →

FAQ

Should I ask foundries to quote in a fixed format?

Yes, and give them the format in the request rather than asking for a rework afterwards. A simple line structure covering tooling, piece price at stated quantities, machining, finishing, freight terms and validity removes most of the normalization work.

What if one quote includes machining and the other does not?

Price the machining separately and add it to the quote that excludes it, using either the second shop's number or a machining quote of your own. Comparing an as-cast price against a machined price is the single most common error in casting sourcing.

How long should a casting quote stay valid?

Ask for the validity window and the metal-price basis in writing. Aluminium prices in 2026 have been moving with tariffs, energy costs and a record Midwest premium, so validity periods are shorter than buyers who last sourced a few years ago expect.

People also search for:

compare foundry quotescasting quote comparisonwhy are casting quotes so differentnormalize supplier quotes

Ready to Transform Your Procurement?

See how Buyer24 can automate your RFQ process, communicate with suppliers worldwide, and save you hours every week.