The scenario

Pat runs inside sales & sourcing at Apex Fastener & Fitting Co., an industrial distributor. A manufacturing customer sent an RFQ for a 15-line fastener kit — Apex sources it at cost, keeps the customer confidential, and quotes back on its own letterhead.

Step 1 of 14 — Buyer24 redacts the customer identity

Customer sends an RFQ — Buyer24 strips the customer identity automatically

Continental Engine Works emails Pat with a PDF spec. Pat just hits Forward — Buyer24 reads the PDF, detects the end-customer, and scrubs the identity before anything reaches a supplier. No manual redaction step.

① Customer's email — landed in Pat's inbox
JR
Jordan Reyes
May 7, 2026, 9:44 AM
to pat@apexfastener.com
subject RFQ — Q2 shutdown fastener kit (15 lines)

Hi Pat,

We're prepping for our Q2 plant shutdown at Continental Engine Works in Fort Worth and need a fastener + fittings kit locked in before the crew starts. Please quote the attached list — stainless hex hardware for the engine line plus brass fittings for the lube circuit.

Net 30 terms. Ship-to:
Continental Engine Works
4400 Tanglewood Pkwy
Fort Worth, TX 76140

On-site by June 5, please.

Thanks,
Jordan Reyes
Maintenance Procurement
Continental Engine Works

PDFcontinental-engine-q2-rfq.pdf180 KB · PDF
② Buyer24's auto-redaction — runs the moment Pat forwards
Buyer24 · intake processingAuto-redaction applied
Forwarded by pat@apexfastener.com
Original from jordan@continentalengine.com
Attachment continental-engine-q2-rfq.pdf (184 KB)
Customer identity detected
  • Company Continental Engine Works
  • Contact Jordan Reyes
  • Email jordan@continentalengine.com
Redacted before supplier dispatch
Customer companyContinental Engine Works[REDACTED]
Customer contactJordan Reyes[REDACTED]
Customer emailjordan@continentalengine.com[REDACTED]
Ship-to line 1Continental Engine WorksCustomer plant
Ship-to line 24400 Tanglewood Pkwy[address withheld until award]
Customer PDFcontinental-engine-q2-rfq.pdfnot forwarded to suppliers — line items extracted into the email body instead
Carried through to suppliers
  • All 15 line items and specifications (parsed from the PDF)
  • Ship-to ZIP (76140) — suppliers need it for freight estimates
  • Target on-site date — June 5
  • Payment terms — Net 30 from Apex
Clean supplier brief ready · Apex is the buyer of record · customer never reaches the supplier pool